WEBVTT

1
00:00:00.000 --> 00:00:04.000
The scraper edge enters ground as the cutterhead moves.

2
00:00:04.000 --> 00:00:08.000
Carbide cuts while the steel body transfers load.

3
00:00:08.000 --> 00:00:12.000
Cut material passes through openings to muck handling.

4
00:00:12.000 --> 00:00:16.000
Check cutting direction, projection and mounting drawings.

